|
|
|
Job-
Structural Install
4G welding installation of conductor
guideframe = 7,000 lbs install.
|
Location-
Oil Platform
Experienced
welders and rope access technicians
performed the work safely over water
where platforms would be vulnerable
to changes in sea state
|
|
|
|
Adjustment of Torque settings
(on board drill ship) The team
were given 24 Hours notice for
mobilization to South Korea
|
Location-
Drill ship
Experienced
technicians performed the work safely
in difficult to access areas on
buoyancy drill stem collars on the
'Stena Drill Max' whilst the vessel
was at sea
|
|
|
|
Repairs to davit arms for swing
stage access access system - Hi
Rise building in San Francisco California
|
Location-
California
Our
certified welders installed the
davits on time and the standard
of workmanship and professionalism
of the crew was commeded by the
client
|
|
|
|
Job-Construction
Installation
of steel trellis. No access for
cranes available so truss and motors
were installed
|
Location
Wynn 'Encore'
Wynn
Encore - Las Vegas - Rigging Technologies
and Dragon Safety Systems rope access
personnel
|
|
|
|
Job-Repairs
Cladding repairs to the wind walls
including replacing 10 foot sections
and associated minor works
|
Location-Semi
Submersible
Post
Hurricane 'Ike' The Thunder hawk
field vessel The 'Mariannas'
|
|
|
|
Job-Safety
Supervision
Supplying
safety supervisors to rig and control
the rope access safety for the Army
Corps of Engineers
|
Location
- Summit Bridge
Summit
Bridge Delaware - the team has spent
a number of week with a crew from
the Army corps of Engineers
|
|
|
*
We are an IRATA member company fully
audited and compliant to this internationally
recognized standard, unlike many other
U.S. Companies who may claim compliance
our total commitment to safety and
quality means we use the scheme wherever
we work.
|
|
|